Maera
Swamp Drilling Barge with Cantilever
8 months - 34 M$ - re-built in SINGAPORE for PT Apexindo
Maera is working for TOTAL in Balikpapan since it's delivery after conversion.
Scope of work:
- Engineering & On–site supervision
- Major conversion of existing swamp barge to cantilever type
Maera after the Blowout
Maera fully rebuilt,
converted to cantilever swamp barge