Raissa
New Heavy Swamp Drilling Barge with Cantilever
18 months - 42 M$ - new built in SINGAPORE for PT Apexindo
The first Cantilever swamp barge in the world. Raissa is working for TOTAL in Balikpapan since2003.
Basic Engineering
- Design criteria
- G. A. drawings
- Weight evaluation and distribution
- Load repartition and Loading Cases, Stability analysis
- Rig description: rebuilt circuits &machinery
- Piping flow sheets for rebuilding / new areas
- Detailed structural design, Stress analysis
- Budget evaluation
- Shipyard call for tender
- Class Approval
On-site supervision
- Construction supervision (structure, piping, electrical, mechanical)
- Supervision of detailed engineering as Owner´s representative
- Coordination for Class approval
- Procurement and logistic
- Budget Reporting
- Repair of existing machineries