Home
About
Services
Our Design
Projects
Contact
soehanah
RIG105
YANI
MAERA
RAISSA
Yani
New Classic Swamp Drilling Barge
10 months - 36 M$ - new built in SINGAPORE for
PT Apexindo
Basic Engineering
Design criteria
G. A. drawings
Weight evaluation and distribution
Load repartition and Loading Cases
Rig description: rebuilt circuits & machinery
Piping flow sheets for rebuilding / new areas
detailed structural design
Stability analysis
Stress analysis
budget evaluation
shipyard call for tender
Class Approval
On-site supervision
Supervision of the construction (structure, piping, electrical, mechanical)
Supervision of detailed engineering as Owner´s representative
Coordination for Class approval
Procurement and logistic
Budget Reporting
Repair of existing machineries
Note: under Protomax
Rig's Charateristics
Yani during inclining test
Contact
© Moonpool Consultants Pte Ltd All Rights Reserved